Within the scope of the projects it carries out, BMC POWER works for the development and production of subsystems and components of the products it undertakes to engineer and produce, with domestic facilities. In addition, necessary test setup investments are made for each of the sub-systems that continue to be developed, and the development processes are continued with these test setups. All studies in the development and production of critical subsystems and components are carried out by our company.
BMC POWER Power Group Test Center provides critical test and evaluation infrastructure for engine and power transmission systems development projects with its state-of-the-art test, measurement and conditioning systems.
All qualification and acceptance test activities of engine, transmission and other power transmission subsystems up to 1800 HP can be performed in the endurance and life test setups with the R&D infrastructure installed in our test center.
In our test center, the installation of special test setups that will be used in the development and qualification of critical subsystems continues.
Our test center has the feature of being a critical investment for our country in the long term with the up-to-date engineering test solutions it will provide in power transmission systems qualification studies.